Location Map SITE PLAN Floor Plans Price List and shop Size Payment Plan |
Supertech Mart Basera Overview
Supertech Mart Basera: Commercial Extension in the existing residential plan to be developed
Supertech Mart at Basera is the commercial layout in sector- 79 of Gurgaon. This commercial project brings along multiple ranges of shopping spaces in the real time. Dissimilar segments of commercial spaces are going to develop in the area ranges from 346 square feet to 954 square feet. This plan is incorporated of key range of amenities planned to merge right away.
Supertech Mart Basera Gurgaon is the additional commercial concept organized and planned to develop as a part of 200 acres residential township by Supertech.
Supertech developers have been remarkably developing residential and commercial projects in the entire National Capital region. This real estate company was founded in the year 1988. This developer has launched numerous innovative and distinct real estate plans in the divergent locations of NCR and pan India.
Supertech Mart Basera prices is updated to reserve a commercial space. Price range for all the segments of commercial spaces starts from Rs- 27.68 lacs to 95.40 lacs. This project has the connectivity to NH- 8 and other additional road transits to route the coming population in this commercial spot of Supertech.
Supertech has proposed this realty layout as a favorable commercial investment in the real time to acquire.
- Located at Sector-79, Gurgaon.
- 5 mins from NH-8 Gurgaon
- 15 mins from Hyatt Hotel
- 20 mins drive from Rajiv Chowk
- 5 mins from Southern Peripheral Road
- 30 mins drive from IGI Airport New Delhi
PRICE LIST- SUPERTECH MART BASERA COMMERCIAL
Basic Sales Price(per sq. ft.) For Ground Floor | ||||
Floor | CLP | PLP | ASSU.Returns | |
BSP | 10000 | 10500 | 11500 | |
Basic Sales Price(per sq. ft.) For Lower Ground Floor | ||||
Floor | CLP | PLP | ASSU.Returns | |
BSP | 9000 | 9500 | 10500 | |
Basic Sales Price(per sq. ft.) For First Floor | ||||
Floor | CLP | PLP | ASSU.Returns | |
BSP | 8000 | 8500 | 9500 | |
One Time Charges | ||||
IFMS | RS 100/ | |||
EDC/IDC | As applicable | |||
Electricity Installation Charges(min 2kw) | Rs 20,000/kw | |||
Power Back Up | Rs 20,000/kw | |||
PLC’s | ||||
Corner | 5% of BSP | |||
Note: (i) 2kw electric installation is mandatory. (ii)1 KW power back up is mandatory |
Supertech Mart Basera Payment Plan
Possession Linked Payment Plan | |
On Booking | 5 Lacs |
Within 30 Days of Allotment | 10% of BSP Less booking Amount |
Within 90 days of Allotment | 20% of BSP |
On Completion of Superstructure | 30% of BSP + 50% Addl. Charges |
On Offer of Possession | 40% of BSP + 50% Addl. Charges |
CLP/Time Linked Payment Plan | |
Within 45 days of booking | 20% less 5 lacs |
On Start of Excavation | 12.5% of BSP |
Witihin 6 months after Excavation | 10% of BSP + 25%(EDC/IDC) |
Within 12 months after Excavation | 10% of BSP + 25%(EDC/IDC) |
Within 18 months after Excavation | 10% of BSP + 25%(EDC/IDC) |
Within 24 months after Excavation | 10% of BSP + 25%(EDC/IDC) |
Within 30 months after Excavation | 10% of BSP + 25%(EDC/IDC) |
Within 36 months after Excavation | 12.5% of BSP + 25%(EDC/IDC) |
On Offer of Possession | 5% + Other Charges(if any) |
Assured Return Payment Plan @12% | |
On Booking | 5 Lacs |
Within 30 Days of Allotment | 98% of Total Cost Less booking Amount |
On Offer of Possession | 2% of Total Cost + IFMS + Stamp Duty + Regs. + EDC/IDC |
Assured Return Flexi Payment Plan @12% | |
On Booking | 5 Lacs |
Within 30 Days of Allotment | 50% of Total Cost Less booking Amount |
On Completion of Super Structure | 40% of Total Cost |
On Offer of Possession | 10% of Total Cost + IFMS + Stamp Duty + Regs. + EDC/IDC |